UserName:
          @makegood-mould.com
 Password:
         
           Project
■ Target

» Excellent communications with our customers

» Excellent communications with our tool shops
•  Accurate tooling quotes, in both time and cost
»On-time/on-cost delivery of tools
» Fully functional tools, accurate to customer's specifications
» Minimal warranty and revision work

■ Features

Our process has the following features:
•  Use of Management System
» Weekly emailed written updates, including issues list and Gantt charts
» Consistent tracking of tool build milestones
» Clear and frequent communications
» Clear documentation

■ Flow 

  This illustrates how a typical tool build will proceed in eight steps from RFQ to tool delivery and beyond: 

Step one: Getting to a quote
   If you would like to submit a Request For Quotation, please send your part file, mould specifications and/or processing information and desired response date to the attention of our Quotation Department via one of the following methods:

a. Email to sales@makegood-mould.com

2D File Format .dwg /.dxf /.pdf

3D File Format .igs /.prt /.step /.x_t

b. Phone: +86-755-33801766  Fax: +86-755-33801599

c. Send samples, CD Disk or Hard copy drawings directly to us at the following address:

  Makegood Plastics & Mould Co., LTD.

  Block 10,fuyuan Industrial Park, tangwei Village, Fuyong Town, BaoAn District, Shen Zhen, China

   Thank you for the opportunity to offer a quotation. Please be assured that we will respond promptly.

Step two: The quote process
    Once we understand your tooling needs thoroughly. We will prepare an RFQ .Typically, we can turn around quotes for one to five tool packages in three business days or less. More complex and larger multi-tool packages may require longer, but we will provide an estimate of the turnaround time to you up-front.

Step three: Your sourcing decision
    We will present a quote to you in a straight-forward, complete and easy-to-read format. All terms and conditions are clearly stated. At this point, you will have the opportunity to discuss the quote with a Makegod engineer, who can answer any technical or general questions you may have. Quotes are valid for thirty days. You should have everything you require to make a tool sourcing decision.

Step four: The design phase
    Once we have received a purchase order from you, our engineer will decide on the conceptual design approach for the tool. Then the tool designers will take over. The design phase will take anywhere from 7 to 10 business days, depending on the complexity and number of tools involved.  Also during this period, you will receive a Gantt chart from Makegood illustrating important steps and milestones in the construction of your tools. Once the design has been completed, it will be reviewed and approved by our engineer. You will have the opportunity to review the design as well, Once we have your written approval to proceed, the tool build will commence. 

Step five: The tool build
    The tool build, for several tools of average complexity, will last approximately four to six weeks. More complex tools and larger packages will take longer; the exact timing will be clear to you from the Gantt charts and updates you will receive from Makegood on a weekly basis. Makegood has the rapid tool making abilities, if you wish to expedite the tool build, we can regulate the making schedule to meet your requirements.

Step six: First shots and qualification
    When the tool build is complete, first shots will be run. Please note that during the qualification runs for the tool, we will attempt to reproduce as closely as possible the conditions under which the tool will be run in production. Once parts are produced that meet your specifications, they will be air freighted to you anywhere in the world. Also at this time, if you require a more robust process to be used to qualify your tools, we will follow your requirements. All of our toolmakers are veterans with the application of statistical process control ( SPC ) techniques in tool qualification. When we have your written approval for the parts, we will prepare the tool for shipment.

Step seven: Tool delivery
    Your tool will be prepared for shipment by either air or sea, according to your wishes. All of our toolmakers are experienced in the preparation of tools for shipment to ensure no damage in transit and no rust (a potential problem for tools improperly prepared for sea shipment). With your tool, you will also receive Final 2D and / or 3D files, final drawings, trial results, including first shots, process parameters used during trial runs, and a neatly organized disk containing all of the above. Electrodes are shipped to you to support warranty, repair and revision work; if preferred.

Step eight: Follow-up service
    One of Makegood’s representatives will follow up with you after tool arrival to be sure that there are no issues. If there are problems with our tool, we will offer spare parts for replacement and assign engineer to solve issue. However, we are confident that Makegood 's business model will result in well built tools for you.

Guangdong ICP equipment 05100339 No. Technical support:SZQYW.NET
All rights reserved:Shenzhen Makegood Plastics & Mould Co., Ltd